Analysis of Rates of Brick Work 100A based on BCD SOR 2022

Analysis of Rates of Brick Work

250 mm (10 inch ) thick Foundation and Plinth Based on BCD SOR 2022

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

6.1.12A Brick Work in Foundation and Plinth with Cement Mortar (1:4)
6.1.14A Brick Work in Foundation and Plinth with Cement Mortar (1:6)
6.3A Extra for Brick Work in Super Structure Plinth to 5 floor
6.4A Extra for Brick Work in Super Structure above 5 floor to each extra 4 floor
6.11A Extra for Forming Cavity
6.12A Half Brick in Cavity Wall
6.13A Brick Work 7 Cm thick
6.15A Brick work in Plain Arches
6.16A Brick work in gauged Arches

Leave a Reply

Your email address will not be published. Required fields are marked *