Analysis of Rates of RCC (Reinforcd Cement Concrete) In This Post Analysis of Rates of BCD Sor 2022 Item Code- 5.33.A – RCC M20 5.33.A.1 – All work up to Plinth Level 5.33.A.2 – All work Plinth upto 5 floor level 5.33.A.2.1 – Coloumn 5.33.A.2.2 – Beam,plinth Beam,Suspended Floor,Roof etc 5.33.B.1 – RCC M25 instead […]