Analysis of Rates of Brick Work 100A based on BCD SOR 2022

Analysis of Rates of Brick Work

250 mm (10 inch ) thick Foundation and Plinth Based on BCD SOR 2022

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

6.1.12ABrick Work in Foundation and Plinth with Cement Mortar (1:4)
6.1.14ABrick Work in Foundation and Plinth with Cement Mortar (1:6)
6.3AExtra for Brick Work in Super Structure Plinth to 5 floor
6.4AExtra for Brick Work in Super Structure above 5 floor to each extra 4 floor
6.11AExtra for Forming Cavity
6.12AHalf Brick in Cavity Wall
6.13ABrick Work 7 Cm thick
6.15ABrick work in Plain Arches
6.16ABrick work in gauged Arches

DocScanner9Sep202221 31 1 Scaled

Gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==
Gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==
Gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==
Gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==

Leave a Reply

Your email address will not be published. Required fields are marked *