Analysis of Rates of Brick Work 100A based on BCD SOR 2022

Analysis of Rates of Brick Work

250 mm (10 inch ) thick Foundation and Plinth Based on BCD SOR 2022

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

6.1.12ABrick Work in Foundation and Plinth with Cement Mortar (1:4)
6.1.14ABrick Work in Foundation and Plinth with Cement Mortar (1:6)
6.3AExtra for Brick Work in Super Structure Plinth to 5 floor
6.4AExtra for Brick Work in Super Structure above 5 floor to each extra 4 floor
6.11AExtra for Forming Cavity
6.12AHalf Brick in Cavity Wall
6.13ABrick Work 7 Cm thick
6.15ABrick work in Plain Arches
6.16ABrick work in gauged Arches

Analysis of Rates of Brick Work 100A based on BCD SOR 2022

Analysis of Rates of Brick Work 100A based on BCD SOR 2022
Analysis of Rates of Brick Work 100A based on BCD SOR 2022
Analysis of Rates of Brick Work 100A based on BCD SOR 2022
Analysis of Rates of Brick Work 100A based on BCD SOR 2022

Leave a Reply

Your email address will not be published. Required fields are marked *