Analysis of Rates of RCC (Reinforcd Cement Concrete) In This Post Analysis of Rates of BCD Sor 2022 Item Code- 5.33.A – RCC M20 5.33.A.1 – All work up to Plinth Level 5.33.A.2 – All work Plinth upto 5 floor level 5.33.A.2.1 – Coloumn 5.33.A.2.2 – Beam,plinth Beam,Suspended Floor,Roof etc 5.33.B.1 – RCC M25 instead […]
Month: August 2022
CPWD SPECIFICATIONS OF BUILDING WORK 2019
CPWD SPECIFICATIONS OF BUILDING WORK 2019 The CPWD Specifications being published by CPWD from time to time are very comprehensive and useful in execution of works and are used as guide by a number of Engineering Departments, Public Sector Undertakings, Architects and Builders. These specifications not only give the standards for building materials but also […]