12 MM CEMENT |
Volume of Mortar = Area of Plaster x Thickness of Plaster
Note – Add 20% to fill up Joint and Cover the Surface |
(A) For 12mm Cement Plaster (1:6) |
Note – Increases by 25% of the Total Dry Volume
For 1 m2 Plaster Area = 1.80/100 = 0.018 m2 Dry Volume of Mortar Needed
Step 1: Amount of Cement Required
Cement Required = 0.00257 m3
Step 2: Quantity of Coarse Sand Required
Coarse Sand Required = 0.01542 m3
Note:By considering dry density of sand= 1550 kg/m3
(B) For 12mm Cement Plaster (1:5) |
Volume Of Mortar = 1.56 m 3 ">
For Cement Mortar (1:5)
Note – Increases by 28.4% of the Total Dry Volume Cement Mortar (1:5) According to BCD Analysis Rates 2114 Cement Mortar (1:5) Corse Sand = 1.07 m3 Cement Required = 0.214 m3 (1.07/5) Then Total Volume = 1.07+0.214 = 1.284 m3 |
For 1 m2 Plaster Area = 1.8489/100 = 0.018489 m2 Dry Volume of Mortar Needed
Step 1: Amount of Cement Required
Cement Required = 0.00308 m3
Step 2: Quantity of Coarse Sand Required
Coarse Sand Required = 0.01541 m3
Note:By considering dry density of sand= 1550 kg/m3
(C) For 12mm Cement Plaster (1:4) |
Volume Of Mortar = 1.56 m 3 ">
For Cement Mortar (1:4)
Note – Increases by 34% of the Total Dry Volume Cement Mortar (1:4) According to BCD Analysis Rates 2114 Cement Mortar (1:4) Corse Sand = 1.07 m3 Cement Required = 0.2675 m3 (1.07/4) Then Total Volume = 1.07+0.2675 = 1.3375 m3 |
For 1 m2 Plaster Area = 1.9296/100 = 0.019296 m2 Dry Volume of Mortar Needed
Step 1: Amount of Cement Required
Cement Required = 0.003859 m3
Step 2: Quantity of Coarse Sand Required
Coarse Sand Required = 0.01541 m3
Note:By considering dry density of sand= 1550 kg/m3
(D) For 12mm Cement Plaster (1:3) |
Volume Of Mortar = 1.56 m 3 ">
For Cement Mortar (1:3)
Note – Increases by 42.7% of the Total Dry Volume Cement Mortar (1:4) According to BCD Analysis Rates 2114 Cement Mortar (1:3) Corse Sand = 1.07 m3 Cement Required = 0.357 m3 (1.07/3) Then Total Volume = 1.07+0.357 = 1.427 m3 |
For 1 m2 Plaster Area = 2.055/100 = 0.02055 m2 Dry Volume of Mortar Needed
Step 1: Amount of Cement Required
Cement Required = 0.00514 m3
Step 2: Quantity of Coarse Sand Required
Coarse Sand Required = 0.01541 m3
Note:By considering dry density of sand= 1550 kg/m3
(E) For 12mm Cement Plaster (1:3) with a Floating Coat of Neat Cement |
Volume Of Mortar = 1.56 m 3 ">Dry Volume Of Mortar = 1.56 + 1.56 × 0.25 ">
Cement Required = 0.00514 m3
Coarse Sand Required = 0.01541 m3
For Floating Coat of Neat Cement 2kg/m2 Cement Will Be Added
Step 1: Amount of Cement Required
Cement = 0.00514+0.0014 = 0.00654 m3
Step 2: Quantity of Coarse Sand Required
Same As Above
Coarse Sand Required = 0.01541 m3
(F) For 12mm Cement Plaster (1:4) with a Floating Coat of Neat Cement |
Volume Of Mortar = 1.56 m 3 ">Dry Volume Of Mortar = 1.56 + 1.56 × 0.25 ">
Cement Required = 0.003859 m3
Coarse Sand Required = 0.01541 m3
For Floating Coat of Neat Cement 2kg/m2 Cement Will Be Added
Step 1: Amount of Cement Required
Cement = 0.003859+0.0014 = 0.00526 m3
Step 2: Quantity of Coarse Sand Required
Same As Above
Coarse Sand Required = 0.01541 m3