15 MM CEMENT PLASTER CALCULATOR

15 MM CEMENT PLASTER CALCULATOR


Plaster Area Calculation

PlasterArea =Length×Width">

Plaster Area =10×10">

Plaster Area =100.00m2">


Material Calculation

Volume of Mortar = Area of Plaster x Thickness of Plaster

Volume Of Mortar =100.00×0.012">

Volume Of Mortar =1.20m3">

Note – Add 15% to fill up Joint and Cover the Surface

Volume Of Mortar =1.20+1.20×0.3">

Volume Of Mortar =1.56m3">

Dry Volume Of Mortar =1.95m3">Surface) = 1.72 Dry Volume Of Mortar =1.95m3">

(A) For 15mm Cement Plaster (1:6)

Volume Of Mortar =1.56m3">

Dry Volume Of Mortar =1.56+1.56×0.25">

Note – Increases by 25% of the Total Dry Volume
Dry Volume Of Mortar =1.95m3"> ————(For 100 m2 Plaster Area)

For 1 m2 Plaster Area = 2.15/100 = 0.0215 m2 Dry Volume of Mortar Needed

Dry Volume Of Mortar =1.95m3">Surface) = 0.0215 Dry Volume Of Mortar =1.95m3">

Step 1: Amount of Cement Required

\begin{equation*} Cement=\frac{\text{Dry Volume X Cement Ratio}}{\text{Sum of Ratio}} \end{equation*}

\begin{equation*} Cement=\frac{\text{0.0215 X 1}}{7} \end{equation*}

Cement Required = 0.00307 m3

No. of Cement Bag Require =13.93Bags">

Require Cement in Kg =696.43kg.">

Step 2: Quantity of Coarse Sand Required

\begin{equation*} Coarse Sand=\frac{\text{Dry Volume X Sand Ratio}}{\text{Sum of Ratio}} \end{equation*}

\begin{equation*} Coarse Sand=\frac{\text{0.0215 X 6}}{7} \end{equation*}

Coarse Sand Required = 0.0184 m3

Require Cement in Kg =696.43kg.">

Note:By considering dry density of sand= 1550 kg/m3


(B) For 15mm Cement Plaster (1:5)

Volume Of Mortar =1.56m3">

For Cement Mortar (1:5)

Dry Volume Of Mortar =1.56+1.56×0.25">

Note – Increases by 28.4% of the Total Dry Volume Cement Mortar (1:5)

According to BCD Analysis Rates 2114 Cement Mortar (1:5)

Corse Sand = 1.07 m3

Cement Required = 0.214 m3 (1.07/5)

Then Total Volume = 1.07+0.214 = 1.284 m3

Dry Volume Of Mortar =1.95m3"> ————(For 100 m2 Plaster Area)

For 1 m2 Plaster Area = 2.208/100 = 0.02208 m2 Dry Volume of Mortar Needed

Step 1: Amount of Cement Required

\begin{equation*} Cement=\frac{\text{Dry Volume X Cement Ratio}}{\text{Sum of Ratio}} \end{equation*}

\begin{equation*} Cement=\frac{\text{0.02208 X 1}}{6} \end{equation*}

Cement Required = 0.00368 m3

No. of Cement Bag Require =13.93Bags">

Require Cement in Kg =696.43kg.">

Step 2: Quantity of Coarse Sand Required

\begin{equation*} Coarse Sand=\frac{\text{Dry Volume X Sand Ratio}}{\text{Sum of Ratio}} \end{equation*}

\begin{equation*} Coarse Sand=\frac{\text{0.02208 X 5}}{6} \end{equation*}

Coarse Sand Required = 0.00184 m3

Require Cement in Kg =696.43kg.">

Note:By considering dry density of sand= 1550 kg/m3


(C) For 15mm Cement Plaster (1:4)

Volume Of Mortar =1.56m3">

For Cement Mortar (1:4)

Dry Volume Of Mortar =1.56+1.56×0.25">

Note – Increases by 34% of the Total Dry Volume Cement Mortar (1:4)

According to BCD Analysis Rates 2113 Cement Mortar (1:4)

Corse Sand = 1.07 m3

Cement Required = 0.2675 m3 (1.07/4)

Then Total Volume = 1.07+0.2675 = 1.3375 m3

Dry Volume Of Mortar =1.95m3"> ————(For 100 m2 Plaster Area)

For 1 m2 Plaster Area = 2.3048/100 = 0.02305 m2 Dry Volume of Mortar Needed

Step 1: Amount of Cement Required

\begin{equation*} Cement=\frac{\text{Dry Volume X Cement Ratio}}{\text{Sum of Ratio}} \end{equation*}

\begin{equation*} Cement=\frac{\text{0.02305 X 1}}{5} \end{equation*}

Cement Required = 0.00461 m3

No. of Cement Bag Require =13.93Bags">

Require Cement in Kg =696.43kg.">

Step 2: Quantity of Coarse Sand Required

\begin{equation*} Coarse Sand=\frac{\text{Dry Volume X Sand Ratio}}{\text{Sum of Ratio}} \end{equation*}

\begin{equation*} Coarse Sand=\frac{\text{0.02305 X 4}}{5} \end{equation*}

Coarse Sand Required = 0.0184 m3

Require Cement in Kg =696.43kg.">

Note:By considering dry density of sand= 1550 kg/m3


(D) For 15mm Cement Plaster (1:3)

Volume Of Mortar =1.56m3">

For Cement Mortar (1:3)

Dry Volume Of Mortar =1.56+1.56×0.25">

Note – Increases by 42.7% of the Total Dry Volume Cement Mortar (1:4)

According to BCD Analysis Rates 2114 Cement Mortar (1:3)

Corse Sand = 1.07 m3

Cement Required = 0.357 m3 (1.07/3)

Then Total Volume = 1.07+0.357 = 1.427 m3

Dry Volume Of Mortar =1.95m3"> ————(For 100 m2 Plaster Area)

For 1 m2 Plaster Area = 2.454/100 = 0.02454 m2 Dry Volume of Mortar Needed

Step 1: Amount of Cement Required

\begin{equation*} Cement=\frac{\text{Dry Volume X Cement Ratio}}{\text{Sum of Ratio}} \end{equation*}

\begin{equation*} Cement=\frac{\text{0.02454 X 1}}{4} \end{equation*}

Cement Required = 0.00614 m3

No. of Cement Bag Require =13.93Bags">

Require Cement in Kg =696.43kg.">

Step 2: Quantity of Coarse Sand Required

\begin{equation*} Coarse Sand=\frac{\text{Dry Volume X Sand Ratio}}{\text{Sum of Ratio}} \end{equation*}

\begin{equation*} Coarse Sand=\frac{\text{0.02454 X 3}}{4} \end{equation*}

Coarse Sand Required = 0.0184 m3

Require Cement in Kg =696.43kg.">

Note:By considering dry density of sand= 1550 kg/m3


(E) For 15mm Cement Plaster (1:3) with a Floating Coat of Neat Cement

Volume Of Mortar =1.56m3">Dry Volume Of Mortar =1.56+1.56×0.25">

Cement Required = 0.00614 m3

Coarse Sand Required = 0.0184 m3

For Floating Coat of Neat Cement 2kg/m2 Cement Will Be Added

Step 1: Amount of Cement Required

Cement = 0.00614+0.0014 = 0.00754 m3

No. of Cement Bag Require =13.93Bags">

Require Cement in Kg =696.43kg.">

Step 2: Quantity of Coarse Sand Required

Same As Above

Coarse Sand Required = 0.0184 m3

Require Cement in Kg =696.43kg.">

Leave a Reply

Your email address will not be published. Required fields are marked *