Analysis of Rates

Analysis of Rates of RCC M25,M20,M15 based on BCD SOR 2022

Analysis of Rates of RCC (Reinforcd Cement Concrete)

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

5.33.A – RCC M20

5.33.A.1 – All work up to Plinth Level

5.33.A.2 – All work Plinth upto 5 floor level

5.33.A.2.1 – Coloumn

5.33.A.2.2 – Beam,plinth Beam,Suspended Floor,Roof etc

5.33.B.1 – RCC M25 instead of M20

5.33.B.2 – RCC M30 instead of M20

5.33.B.3 – RCC M35 instead of M20

5.33.B.4 – RCC M15 instead of M20

5.33A Providing and laying in position machine batched, machine mixed and machine vibrated design
mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete

 

 

 

Civil

Recent Posts

Schedule of Rates (SOR) क्या है? | A Complete Beginner’s Guide

अगर आप construction industry से जुड़े हैं या फिर किसी government project के बारे में…

7 hours ago

Telangana Schedule of Rates 2025-26 PDF Free Download

Telangana SOR क्या है और क्यों जरूरी है? Schedule of Rates यानी SOR एक official…

1 day ago

BCD SOR in Excel | Bihar Schedule of Rates Excel Format

BCD SOR in Excel BCD SOR क्या है? BCD SOR (Bihar Schedule of Rates) एक…

6 days ago

Types of Vibrators Used in Construction: A Complete Guide

Types of Vibrators Used in Construction: A Complete Guide कंक्रीट की quality और durability सुनिश्चित…

2 weeks ago

Bihar BCD SOR 2025 | UPDATED SCHEDULE OF RATES FREE DOWNLOAD

BCD SOR 2025 क्या है? UPDATED SOR BY BCD भारतीय निर्माण कार्यों में SOR (Schedule…

2 weeks ago

25+ Common Mistakes in Construction जो आपको लाखों का नुकसान दे सकती हैं

25+ Common Mistakes in Construction पिछले महीने मेरे पड़ोसी का घर बनकर तैयार हुआ। बाहर…

3 weeks ago

This website uses cookies.