Analysis of Rates

Analysis of Rates of RCC M25,M20,M15 based on BCD SOR 2022

Analysis of Rates of RCC (Reinforcd Cement Concrete)

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

5.33.A – RCC M20

5.33.A.1 – All work up to Plinth Level

5.33.A.2 – All work Plinth upto 5 floor level

5.33.A.2.1 – Coloumn

5.33.A.2.2 – Beam,plinth Beam,Suspended Floor,Roof etc

5.33.B.1 – RCC M25 instead of M20

5.33.B.2 – RCC M30 instead of M20

5.33.B.3 – RCC M35 instead of M20

5.33.B.4 – RCC M15 instead of M20

5.33A Providing and laying in position machine batched, machine mixed and machine vibrated design
mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete

 

 

 

Civil

Recent Posts

Delhi Schedule of Rate 2023 Civil PDF Free Download

Delhi Schedule of Rate (DSR) 2023 Civil भारत  में भवनों का प्राक्कलन  गठन करने हेतु…

5 months ago

Minimum Requirement for Fire Fighting Installations of a Residential and Non Residential Buildings

Minimum Requirement for Fire Fighting Installations प्रत्येक भवन को इस प्रकार डिज़ाइन, निर्मित, सुसज्जित, रखरखाव…

5 months ago

Jharkhand Building Schedule of Rates 2015 PDF Free Download

Jharkhand Building Schedule of Rates झारखण्ड  राज्य में भवनों का प्राक्कलन  गठन करने हेतु हमें…

6 months ago

Jharkhand Building Schedule of Rates 2014 PDF Free Download

Jharkhand Building Schedule of Rates झारखण्ड  राज्य में भवनों का प्राक्कलन  गठन करने हेतु हमें…

6 months ago

बिहार ठीकेदारी नियमावली 2007 – पथ निर्माण विभाग

बिहार ठीकेदारी नियमावली 2007 - पथ निर्माण विभाग Bihar Thikedari Nayamawali 2007 Overview Name of…

6 months ago

Tripura PWD Road and Bridge Schedule of Rates 2023 PDF Free Download

Tripura  PWD Road and Bridge Schedule of Rates 2023 Tripura Schedule of Rates being published…

11 months ago