Analysis of Rates

Analysis of Rates of RCC M25,M20,M15 based on BCD SOR 2022

Analysis of Rates of RCC (Reinforcd Cement Concrete)

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

5.33.A – RCC M20

5.33.A.1 – All work up to Plinth Level

5.33.A.2 – All work Plinth upto 5 floor level

5.33.A.2.1 – Coloumn

5.33.A.2.2 – Beam,plinth Beam,Suspended Floor,Roof etc

5.33.B.1 – RCC M25 instead of M20

5.33.B.2 – RCC M30 instead of M20

5.33.B.3 – RCC M35 instead of M20

5.33.B.4 – RCC M15 instead of M20

5.33A Providing and laying in position machine batched, machine mixed and machine vibrated design
mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding the cost of centring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete

 

 

 

Civil

Recent Posts

BSPTCL SOR 2024-25: Bihar State Power Transmission Company Limited SOR

अगर आप Bihar के Power Transmission sector में काम करते हैं — चाहे आप एक…

23 hours ago

जानिए कुछ मिनट में Install होने वाले German Style Pagoda Tent के बारे में

SECTION 01 परिचय एवं इतिहास German Style Pagoda Tent एक उच्च-शिखर (High-Peaked) वाली अस्थायी (Temporary)…

5 days ago

GEO BAG – बाढ़ सुरक्षा की आधुनिक तकनीक | Complete Technical Reference and Specifications

GEO BAG बाढ़ सुरक्षा की आधुनिक तकनीक Geotextile Bag – सम्पूर्ण तकनीकी संदर्भ एवं विशिष्टताएँ…

2 weeks ago

Methods of Measurement of Earthwork as per IS Code:1200 Part 1:1992

Methods of Measurement of Earthwork का Complete Guide Introduction: IS 1200 Part 1 क्या है?…

3 months ago

Schedule of Rates (SOR) क्या है? | A Complete Beginner’s Guide

अगर आप construction industry से जुड़े हैं या फिर किसी government project के बारे में…

3 months ago

Telangana Schedule of Rates 2025-26 PDF Free Download

Telangana SOR क्या है और क्यों जरूरी है? Schedule of Rates यानी SOR एक official…

3 months ago

This website uses cookies.