Analysis of Rates

Analysis of Rates of Brick Work 100A based on BCD SOR 2022

Analysis of Rates of Brick Work

250 mm (10 inch ) thick Foundation and Plinth Based on BCD SOR 2022

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

6.1.12A Brick Work in Foundation and Plinth with Cement Mortar (1:4)
6.1.14A Brick Work in Foundation and Plinth with Cement Mortar (1:6)
6.3A Extra for Brick Work in Super Structure Plinth to 5 floor
6.4A Extra for Brick Work in Super Structure above 5 floor to each extra 4 floor
6.11A Extra for Forming Cavity
6.12A Half Brick in Cavity Wall
6.13A Brick Work 7 Cm thick
6.15A Brick work in Plain Arches
6.16A Brick work in gauged Arches

Civil

Recent Posts

Tripura PWD Road and Bridge Schedule of Rates 2023 PDF Free Download

Tripura  PWD Road and Bridge Schedule of Rates 2023 Tripura Schedule of Rates being published…

5 months ago

Tripura PWD Building Schedule of Rates 2023 PDF Free Download

Tripura PWD Building Schedule of Rates 2023 Tripura Schedule of Rates being published by  Public…

5 months ago

MILITARY ENGINEER SERVICES SCHEDULE OF RATES 2020 PDF Free Download

MILITARY ENGINEER SERVICES SCHEDULE OF RATES 2020 MES Standard Schedule of Rates Part II covering…

5 months ago

बिहार ठीकेदारी नियमावली 2007 – पथ निर्माण विभाग

बिहार ठीकेदारी नियमावली 2007 - पथ निर्माण विभाग Bihar Thikedari Nayamawali 2007 Overview Name of…

5 months ago

BCD Electric SOR 2023 – Download Electric SOR Bihar 2023

BCD Electric SOR 2023 बिहार राज्य में भवनों का प्राक्कलन  गठन करने हेतु हमें कुछ…

7 months ago

20 MM CEMENT PLASTER CALCULATOR

20 MM CEMENT PLASTER CALCULATOR Plaster Area Calculation PlasterArea = Length × Width Plaster Area…

9 months ago