Analysis of Rates

Analysis of Rates of Brick Work 100A based on BCD SOR 2022

Analysis of Rates of Brick Work

250 mm (10 inch ) thick Foundation and Plinth Based on BCD SOR 2022

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

6.1.12A Brick Work in Foundation and Plinth with Cement Mortar (1:4)
6.1.14A Brick Work in Foundation and Plinth with Cement Mortar (1:6)
6.3A Extra for Brick Work in Super Structure Plinth to 5 floor
6.4A Extra for Brick Work in Super Structure above 5 floor to each extra 4 floor
6.11A Extra for Forming Cavity
6.12A Half Brick in Cavity Wall
6.13A Brick Work 7 Cm thick
6.15A Brick work in Plain Arches
6.16A Brick work in gauged Arches

Civil

Recent Posts

BSPTCL SOR 2024-25: Bihar State Power Transmission Company Limited SOR

अगर आप Bihar के Power Transmission sector में काम करते हैं — चाहे आप एक…

3 weeks ago

जानिए कुछ मिनट में Install होने वाले German Style Pagoda Tent के बारे में

SECTION 01 परिचय एवं इतिहास German Style Pagoda Tent एक उच्च-शिखर (High-Peaked) वाली अस्थायी (Temporary)…

4 weeks ago

GEO BAG – बाढ़ सुरक्षा की आधुनिक तकनीक | Complete Technical Reference and Specifications

GEO BAG बाढ़ सुरक्षा की आधुनिक तकनीक Geotextile Bag – सम्पूर्ण तकनीकी संदर्भ एवं विशिष्टताएँ…

1 month ago

Methods of Measurement of Earthwork as per IS Code:1200 Part 1:1992

Methods of Measurement of Earthwork का Complete Guide Introduction: IS 1200 Part 1 क्या है?…

4 months ago

Schedule of Rates (SOR) क्या है? | A Complete Beginner’s Guide

अगर आप construction industry से जुड़े हैं या फिर किसी government project के बारे में…

4 months ago

Telangana Schedule of Rates 2025-26 PDF Free Download

Telangana SOR क्या है और क्यों जरूरी है? Schedule of Rates यानी SOR एक official…

4 months ago

This website uses cookies.