Question No. 1.
To determine the length of a bridge proposed to be built across a wide river ,the surveying method of choice would be

Answer

Answer: Option A

Question No. 2.
Heliograph is a type of  instrument

Answer

Answer: Option D

Question No. 3.
The map projection in which the angle between any pair of short lines is represented correctly is called

Answer

Answer: Option A

Question No. 4.
If L is the measured length of a line, then the compensating errors are proportional to

Answer

Show Answer Option A

Question No. 5.
If h is the difference in height berween the end points of a chain of length L,the slope correction is approximately equal to

Answer

Show Answer Option D

Civil

Recent Posts

Latest Bihar Schedule of Rates | PWD, WRD, BCD, RCD, CIVIL , Electrical

Latest Bihar Schedule of Rates   What is a Schedule of Rates (SOR)? A Schedule…

2 months ago

WRD SOR 2025 Bihar Pdf free Download

Water Resources Department Schedule of Rates 2025 Pdf (Effective From 13.02.2025) Water Resources Department is…

2 months ago

WRD SOR 2023 Bihar Pdf free Download

Water Resources Department Schedule of Rates 2023 Pdf (Effective From 03.11.2023) Water Resources Department is…

2 months ago

Delhi Schedule of Rate 2023 Civil PDF Free Download

Delhi Schedule of Rate (DSR) 2023 Civil भारत  में भवनों का प्राक्कलन  गठन करने हेतु…

1 year ago

Minimum Requirement for Fire Fighting Installations of a Residential and Non Residential Buildings

Minimum Requirement for Fire Fighting Installations प्रत्येक भवन को इस प्रकार डिज़ाइन, निर्मित, सुसज्जित, रखरखाव…

1 year ago

Jharkhand Building Schedule of Rates 2015 PDF Free Download

Jharkhand Building Schedule of Rates झारखण्ड  राज्य में भवनों का प्राक्कलन  गठन करने हेतु हमें…

1 year ago