Question No. 1.
To determine the length of a bridge proposed to be built across a wide river ,the surveying method of choice would be

Answer

Answer: Option A

Question No. 2.
Heliograph is a type of  instrument

Answer

Answer: Option D

Question No. 3.
The map projection in which the angle between any pair of short lines is represented correctly is called

Answer

Answer: Option A

Question No. 4.
If L is the measured length of a line, then the compensating errors are proportional to

Answer

Show Answer Option A

Question No. 5.
If h is the difference in height berween the end points of a chain of length L,the slope correction is approximately equal to

Answer

Show Answer Option D

Civil

Recent Posts

Methods of Measurement of Earthwork as per IS Code:1200 Part 1:1992

Methods of Measurement of Earthwork का Complete Guide Introduction: IS 1200 Part 1 क्या है?…

1 month ago

Schedule of Rates (SOR) क्या है? | A Complete Beginner’s Guide

अगर आप construction industry से जुड़े हैं या फिर किसी government project के बारे में…

1 month ago

Telangana Schedule of Rates 2025-26 PDF Free Download

Telangana SOR क्या है और क्यों जरूरी है? Schedule of Rates यानी SOR एक official…

1 month ago

BCD SOR in Excel | Bihar Schedule of Rates Excel Format

BCD SOR in Excel BCD SOR क्या है? BCD SOR (Bihar Schedule of Rates) एक…

1 month ago

Types of Vibrators Used in Construction: A Complete Guide

Types of Vibrators Used in Construction: A Complete Guide कंक्रीट की quality और durability सुनिश्चित…

2 months ago

Bihar BCD SOR 2025 | UPDATED SCHEDULE OF RATES FREE DOWNLOAD

BCD SOR 2025 क्या है? UPDATED SOR BY BCD भारतीय निर्माण कार्यों में SOR (Schedule…

2 months ago

This website uses cookies.