Analysis of Rates

Analysis of Rates of Brick Work 100A based on BCD SOR 2022

Analysis of Rates of Brick Work

250 mm (10 inch ) thick Foundation and Plinth Based on BCD SOR 2022

In This Post Analysis of Rates of BCD Sor 2022 Item Code-

6.1.12A Brick Work in Foundation and Plinth with Cement Mortar (1:4)
6.1.14A Brick Work in Foundation and Plinth with Cement Mortar (1:6)
6.3A Extra for Brick Work in Super Structure Plinth to 5 floor
6.4A Extra for Brick Work in Super Structure above 5 floor to each extra 4 floor
6.11A Extra for Forming Cavity
6.12A Half Brick in Cavity Wall
6.13A Brick Work 7 Cm thick
6.15A Brick work in Plain Arches
6.16A Brick work in gauged Arches

Civil

Recent Posts

BSPTCL SOR 2024-25: Bihar State Power Transmission Company Limited SOR

अगर आप Bihar के Power Transmission sector में काम करते हैं — चाहे आप एक…

23 hours ago

जानिए कुछ मिनट में Install होने वाले German Style Pagoda Tent के बारे में

SECTION 01 परिचय एवं इतिहास German Style Pagoda Tent एक उच्च-शिखर (High-Peaked) वाली अस्थायी (Temporary)…

5 days ago

GEO BAG – बाढ़ सुरक्षा की आधुनिक तकनीक | Complete Technical Reference and Specifications

GEO BAG बाढ़ सुरक्षा की आधुनिक तकनीक Geotextile Bag – सम्पूर्ण तकनीकी संदर्भ एवं विशिष्टताएँ…

2 weeks ago

Methods of Measurement of Earthwork as per IS Code:1200 Part 1:1992

Methods of Measurement of Earthwork का Complete Guide Introduction: IS 1200 Part 1 क्या है?…

3 months ago

Schedule of Rates (SOR) क्या है? | A Complete Beginner’s Guide

अगर आप construction industry से जुड़े हैं या फिर किसी government project के बारे में…

3 months ago

Telangana Schedule of Rates 2025-26 PDF Free Download

Telangana SOR क्या है और क्यों जरूरी है? Schedule of Rates यानी SOR एक official…

3 months ago

This website uses cookies.