Plaster Area Calculation


Material Calculation

Volume of Mortar = Area of Plaster x Thickness of Plaster

Note – Add 20% to fill up Joint and Cover the Surface

Surface)  = 1.44

(A) For 12mm Cement Plaster (1:6)

Note – Increases by 25% of the Total Dry Volume
         ————(For 100 m2 Plaster Area)

For 1 m2 Plaster Area = 1.80/100 = 0.018 m2 Dry Volume of Mortar Needed

Surface)  = 0.018

Step 1: Amount of Cement Required

 

   

 

   

Cement Required = 0.00257 m3

 

Step 2: Quantity of Coarse Sand Required

   

 

   

Coarse Sand Required = 0.01542 m3

Note: By considering dry density of sand = 1550 kg/m3


(B) For 12mm Cement Plaster (1:5)

For Cement Mortar (1:5)

Note – Increases by 28.4% of the Total Dry Volume Cement Mortar (1:5)

According to BCD Analysis Rates 2114 Cement Mortar (1:5)

Corse Sand = 1.07 m3

Cement Required = 0.214 m3 (1.07/5)

Then Total Volume = 1.07+0.214 = 1.284 m3

         ————(For 100 m2 Plaster Area)

For 1 m2 Plaster Area = 1.8489/100 = 0.018489 m2 Dry Volume of Mortar Needed

Step 1: Amount of Cement Required

 

   

 

   

Cement Required = 0.00308 m3

 

Step 2: Quantity of Coarse Sand Required

   

 

   

Coarse Sand Required = 0.01541 m3

Note: By considering dry density of sand = 1550 kg/m3


(C) For 12mm Cement Plaster (1:4)

For Cement Mortar (1:4)

Note – Increases by 34% of the Total Dry Volume Cement Mortar (1:4)

According to BCD Analysis Rates 2114 Cement Mortar (1:4)

Corse Sand = 1.07 m3

Cement Required = 0.2675 m3 (1.07/4)

Then Total Volume = 1.07+0.2675 = 1.3375 m3

         ————(For 100 m2 Plaster Area)

For 1 m2 Plaster Area = 1.9296/100 = 0.019296 m2 Dry Volume of Mortar Needed

Step 1: Amount of Cement Required

 

   

 

   

Cement Required = 0.003859 m3

 

Step 2: Quantity of Coarse Sand Required

   

 

   

Coarse Sand Required = 0.01541 m3

Note: By considering dry density of sand = 1550 kg/m3


(D) For 12mm Cement Plaster (1:3)

For Cement Mortar (1:3)

Note – Increases by 42.7% of the Total Dry Volume Cement Mortar (1:4)

According to BCD Analysis Rates 2114 Cement Mortar (1:3)

Corse Sand = 1.07 m3

Cement Required = 0.357 m3 (1.07/3)

Then Total Volume = 1.07+0.357 = 1.427 m3

         ————(For 100 m2 Plaster Area)

For 1 m2 Plaster Area = 2.055/100 = 0.02055 m2 Dry Volume of Mortar Needed

Step 1: Amount of Cement Required

 

   

 

   

Cement Required = 0.00514 m3

 

Step 2: Quantity of Coarse Sand Required

   

 

   

Coarse Sand Required = 0.01541 m3

Note: By considering dry density of sand = 1550 kg/m3


(E) For 12mm Cement Plaster (1:3) with a Floating Coat of Neat Cement

Cement Required = 0.00514 m3

Coarse Sand Required = 0.01541 m3

For Floating Coat of Neat Cement  2kg/mCement Will Be Added

Step 1: Amount of Cement Required

Cement = 0.00514+0.0014 = 0.00654 m3

Step 2: Quantity of Coarse Sand Required

Same As Above

Coarse Sand Required = 0.01541 m3


(F) For 12mm Cement Plaster (1:4) with a Floating Coat of Neat Cement

Cement Required = 0.003859 m3

Coarse Sand Required = 0.01541 m3

For Floating Coat of Neat Cement  2kg/mCement Will Be Added

Step 1: Amount of Cement Required

Cement = 0.003859+0.0014 = 0.00526 m3

Step 2: Quantity of Coarse Sand Required

Same As Above

Coarse Sand Required = 0.01541 m3

Civil

Recent Posts

BSPTCL SOR 2024-25: Bihar State Power Transmission Company Limited SOR

अगर आप Bihar के Power Transmission sector में काम करते हैं — चाहे आप एक…

3 days ago

जानिए कुछ मिनट में Install होने वाले German Style Pagoda Tent के बारे में

SECTION 01 परिचय एवं इतिहास German Style Pagoda Tent एक उच्च-शिखर (High-Peaked) वाली अस्थायी (Temporary)…

7 days ago

GEO BAG – बाढ़ सुरक्षा की आधुनिक तकनीक | Complete Technical Reference and Specifications

GEO BAG बाढ़ सुरक्षा की आधुनिक तकनीक Geotextile Bag – सम्पूर्ण तकनीकी संदर्भ एवं विशिष्टताएँ…

3 weeks ago

Methods of Measurement of Earthwork as per IS Code:1200 Part 1:1992

Methods of Measurement of Earthwork का Complete Guide Introduction: IS 1200 Part 1 क्या है?…

3 months ago

Schedule of Rates (SOR) क्या है? | A Complete Beginner’s Guide

अगर आप construction industry से जुड़े हैं या फिर किसी government project के बारे में…

3 months ago

Telangana Schedule of Rates 2025-26 PDF Free Download

Telangana SOR क्या है और क्यों जरूरी है? Schedule of Rates यानी SOR एक official…

3 months ago

This website uses cookies.