Water required for fire fighting is usually known as fire demand . Rate of fire demand is treated as a function of population and is worked out on the basis of empirical formula as follow-
| |
where ,
Q = Amount of water required in liters/minute
P = Population in thousand
| |
where
Q = Amount of water required in liters/minute
P = Population in thousand
F = number of simultaneous fire streams
(1) Where Population < 200000
| |
(2) Where Population > 200000
| For First Fire(lit/minute) For Second Fire(lit/minute) Q=9100 to 36400 |
| No. | Type of Building | Amount of Water Required (Q) |
|---|---|---|
| 1. | Small or Low Buildings | Q=2200 lit/minute |
| 2. | Larger or higher buildings | Q=4500 lit/minute |
| 3. | Apartment, High Value Residences,Tenements | Q=7650 to 13500 lit/minute |
| 4. | Three Storeyed Buildings in Density Builtup Sections | Q=27000 lit/minute |
| |
where
Q = Amount of water required in liters/minute
P = Population in thousand
The above formulae for water demand donot take into account the frequency of fire may occur.It may be determined from the following expression :-
| |
where
t = Duration of fire in minutes
T =Period of occurance of fire in years
Note:- The recommended minimum values for the above formula are t=30minutes, T = 1 year
अगर आप construction industry से जुड़े हैं या फिर किसी government project के बारे में…
Telangana SOR क्या है और क्यों जरूरी है? Schedule of Rates यानी SOR एक official…
BCD SOR in Excel BCD SOR क्या है? BCD SOR (Bihar Schedule of Rates) एक…
Types of Vibrators Used in Construction: A Complete Guide कंक्रीट की quality और durability सुनिश्चित…
BCD SOR 2025 क्या है? UPDATED SOR BY BCD भारतीय निर्माण कार्यों में SOR (Schedule…
25+ Common Mistakes in Construction पिछले महीने मेरे पड़ोसी का घर बनकर तैयार हुआ। बाहर…
This website uses cookies.