Surveying

Land Surveying – Basic Principal and Classification [Surveying MCQ]- Page 4

Question No.16.

In photogrammetric surveying, the stereoscopic view in which the overlaps are kept outwards and in which natural order is reversed is called:

[Coal India 2016]

Answer

Answer:Option B


Question No. 17.

Geodetic survey is different from plane surveying because of

[SSC JE 1 MARCH 2017 Moming Shift]

Answer

Answer:Option B


Question No. 18.

The surveying used to determine additional details such as boundaries of fields, is called:

[UPJAL NIGAM JE 2016]

Answer

Answer:Option C


Question No. 19.

Which of following is not an important factor which needs to be considered while preparing maps

[UPRVUNL JE 2014|

Answer

Answer:Option A


Question No. 20.

The headquarters of survey of India is located at

[ESIC JE 2016]

Answer

Answer:Option D


Civil

Recent Posts

Latest Bihar Schedule of Rates | PWD, WRD, BCD, RCD, CIVIL , Electrical

Latest Bihar Schedule of Rates   What is a Schedule of Rates (SOR)? A Schedule…

1 month ago

WRD SOR 2025 Bihar Pdf free Download

Water Resources Department Schedule of Rates 2025 Pdf (Effective From 13.02.2025) Water Resources Department is…

1 month ago

WRD SOR 2023 Bihar Pdf free Download

Water Resources Department Schedule of Rates 2023 Pdf (Effective From 03.11.2023) Water Resources Department is…

2 months ago

Delhi Schedule of Rate 2023 Civil PDF Free Download

Delhi Schedule of Rate (DSR) 2023 Civil भारत  में भवनों का प्राक्कलन  गठन करने हेतु…

12 months ago

Minimum Requirement for Fire Fighting Installations of a Residential and Non Residential Buildings

Minimum Requirement for Fire Fighting Installations प्रत्येक भवन को इस प्रकार डिज़ाइन, निर्मित, सुसज्जित, रखरखाव…

12 months ago

Jharkhand Building Schedule of Rates 2015 PDF Free Download

Jharkhand Building Schedule of Rates झारखण्ड  राज्य में भवनों का प्राक्कलन  गठन करने हेतु हमें…

12 months ago