Land Surveying – Basic Principal and Classification [Surveying MCQ]- Page 2

Question No.6.

The principle of “working from whole to part” is used in surveying because

[Utarakhand JE 2016]

Answer

Answer:Option C


Question No. 7.

The type of surveying in which the curvature of the earth is taken into account is called….

[SSC JE 2 MARCH 2017 Morning Shift ]

Answer

Answer:Option A


Question No. 8.

The measurement of longitudinal section survey is done on which basis?

[NPCC JE 21 Jan 2017]

Answer

Answer:Option A


Question No. 9.

Permissible limits of error in chaining for measurement on rough or hilly ground is ……

[SSC JE 1 MARCH 2017 Evening Shift]

Answer

Answer:Option D


Question No. 10.

The point of the celestial sphere vertically below the observa’s position is called:

[RJC Exam, 21-08-2016]

Answer

Answer:Option D


Civil

Recent Posts

Latest Bihar Schedule of Rates | PWD, WRD, BCD, RCD, CIVIL , Electrical

Latest Bihar Schedule of Rates   What is a Schedule of Rates (SOR)? A Schedule…

2 months ago

WRD SOR 2025 Bihar Pdf free Download

Water Resources Department Schedule of Rates 2025 Pdf (Effective From 13.02.2025) Water Resources Department is…

2 months ago

WRD SOR 2023 Bihar Pdf free Download

Water Resources Department Schedule of Rates 2023 Pdf (Effective From 03.11.2023) Water Resources Department is…

2 months ago

Delhi Schedule of Rate 2023 Civil PDF Free Download

Delhi Schedule of Rate (DSR) 2023 Civil भारत  में भवनों का प्राक्कलन  गठन करने हेतु…

1 year ago

Minimum Requirement for Fire Fighting Installations of a Residential and Non Residential Buildings

Minimum Requirement for Fire Fighting Installations प्रत्येक भवन को इस प्रकार डिज़ाइन, निर्मित, सुसज्जित, रखरखाव…

1 year ago

Jharkhand Building Schedule of Rates 2015 PDF Free Download

Jharkhand Building Schedule of Rates झारखण्ड  राज्य में भवनों का प्राक्कलन  गठन करने हेतु हमें…

1 year ago