[latexpage] 1. Water Content \begin{equation*} w=\frac{W_w}{W_s}\times 100 \end{equation*} where , Ww = Weight of water Ws = Weight…
Water Demand Formula for Fire Fighting - Environmental Engineering FIRE DEMAND FORMULA Water required for fire fighting is usually…
बिहार सरकार , पथ निर्माण विभाग के अधिसूचना संख्या प्रo /स्थाo- नियुक्ति 01-01/2018 /5565 दिनांक 09.11.2022 द्वारा बिहार अभियंत्रण सेवा…
Analysis of Cement Mortars , Lime Mortars on BCD SOR 2022 In This Post Analysis of Rates of BCD Sor…
Analysis of Rates of Brick Work 250 mm (10 inch ) thick Foundation and Plinth Based on BCD SOR 2022…
Analysis of Rates of TMT Steel Bar 8mm,10mm,12mm,16mm,20mm,25mm based on BCD SOR 2022 In This Post Analysis of Rates of…
Analysis of Rates of RCC (Reinforcd Cement Concrete) In This Post Analysis of Rates of BCD Sor 2022 Item Code-…
CPWD SPECIFICATIONS OF BUILDING WORK 2019 The CPWD Specifications being published by CPWD from time to time are very comprehensive…
Plinth Area Rates 2020 Plinth area rates published by CPWD is a useful technical document for preparation of preliminary cost…
Question No. 31. The failure plane is predetermined in the A. triaxial shear test B. direct shear test C. vane…